Skip to content
Farm Machines Testing
Machine-Specific

FMTTI Power Tiller Testing: Full Breakdown & Cost

— Farm Machine Testing Desk

Power tillers get their own dedicated test regime at FMTTI — they're not folded into the general implement schedule, and the paperwork, sealing rules and validity period all reflect that.

What the test actually covers

A power tiller going through an Initial Commercial Test (ICT) is checked machine-by-machine against a fixed sequence of individual tests, each separately specified and separately charged. At SRFMTTI's current published breakdown, that sequence is:

Test itemCharge
Specification / Initial Inspection₹22,693
Running-in (20 hours)₹76,888
Rotary Performance Test₹23,562
Brake Performance Test₹5,339
Drawbar Performance Test₹25,579
Noise Level Test₹9,066
Turning Ability Test₹3,442
Nominal Speed Test₹3,661
Haulage Test₹17,517
Field Test₹1,09,235
Torture Test₹7,229
Material Test & Chemical Composition₹9,735
Miscellaneous charges₹93,531

The Field Test is the single biggest line item by far — it's where the machine's real tilling, handling and performance across soil conditions gets proven out, alongside the Rotary and Drawbar tests that check how the machine actually delivers power to the ground.

Two totals, one test

Add it all up and you get ₹4,07,478 including the 20-hour running-in, or ₹3,30,590 if running-in is costed separately or not required. That's the figure under the dedicated power-tiller circular that governs SRFMTTI's current schedule — it's a different number from the general per-category fee schedule's power-tiller line, which covers a broader bucket ("power tiller-drawn/self-propelled reaper, power weeder etc.") under a different circular entirely. Each number answers a different question, and neither is wrong — but they're not interchangeable, so it's worth confirming with your target institute which schedule and which circular actually applies to your machine before you budget.

How long the report lasts

Power tillers carry one of the shortest validity windows on the books. The Initial Commercial Test report is valid for 3 years, and a subsequent Batch Test extends that for another 5 years. Tractors sit on the exact same 3-year/5-year structure — most other machinery categories (implements, post-harvest equipment, plant protection gear) run on a longer 5-7 year ICT cycle. Worth marking that 3-year date on a calendar the day the report is issued.

Batch testing: sealed and sampled

When a power tiller comes up for Batch testing, it has to be a genuine production unit — selected at random from series production already cleared for delivery to distributors, with no checks or adjustments allowed after selection. A defined list of assemblies gets physically sealed before testing: the engine sump, fuel-injection pump and governor, injector, cylinder head, clutch, gearbox, rotary chain case, drive wheels and rotary shaft end covers. Bolts are drilled and sealed with lead and twisted wire so nothing can be opened without visibly breaking the seal, and the manufacturer's representative signs off on the sealing in person. The paperwork is done in triplicate with carbon copies going to the correspondence file, the technical file and the manufacturer's rep. Delivering the tiller to the institute with every seal intact is the manufacturer's responsibility.

Documents you'll need

Power tillers have two extra document requirements beyond the standard application set: a valid CMVR certificate and a valid engine emission certificate, both current as of the date of application. Along with those, the institute wants the application form, technical specification, performance declaration, operator's and service manuals, parts catalogue and photographs — most in three sets.

Where we fit in

We guide manufacturers and dealers through this process — getting the documentation into the right format, confirming which fee schedule and circular actually governs your machine, and liaising with the institute on scheduling. The physical testing itself — running-in, rotary, brake, drawbar, field and every other item on that list — is always carried out by FMTTI's own test engineers, at the institute.

Frequently asked questions

A fixed sequence covering specification/initial inspection, 20-hour running-in, rotary performance, brake performance, drawbar performance, noise level, turning ability, nominal speed, haulage, field test, torture test, and material/chemical composition testing — each separately specified and charged.
Start here

Have a question this post didn't answer?

WhatsApp us — we reply within one business day, free and no obligation.

Offices
Pune · New Delhi
Response time
One business day

Tell us about your machine.

We reply within one business day. Free, no-obligation guidance.

Free & no-obligation. One business day.