Skip to content
Farm Machines Testing
The backbone of machinery certification in India

FMTTI, explained: what it is, what it tests, and how AgPro guides you through it.

FMTTI — the Farm Machinery Training and Testing Institute network — is the government testing authority most Indian manufacturers and subsidy-scheme buyers eventually go through. This is the single most-referenced resource on this site; every fact below traces to a government source.

Section 01

What is FMTTI?

FMTTI stands for Farm Machinery Training and Testing Institute— a network of institutes under India’s Ministry of Agriculture & Farmers Welfare that trains operators and tests agricultural machinery for performance, safety and compliance. The oldest, at Budni, has functioned since 1955; the network was built out regionally through 1963, 1983 and 1990.

Why this matters for you

If your machine needs to qualify for a government subsidy scheme, or you simply want independent proof of how it performs, an FMTTI test report is very often the document that unlocks it.

Section 02

The 4 FMTTIs — and 38 more approved testing centres

Each FMTTI covers a region of India, and one — CFMTTI Budni — also runs tractor type-approval testing nationally. The FMTTIs aren't the only approved bodies, though: 38 additional State Agricultural Universities, ICAR institutions and state departments are also officially identified testing centres, covering nearly every state.

InstituteLocationEstablishedCoverage
CFMTTICentral Farm Machinery Training & Testing InstituteBudni, Sehore district, Madhya Pradesh1955All-India + national tractor type-approval/homologation mandate
NRFMTTINorthern Region Farm Machinery Training & Testing InstituteHisar, Haryana1963Northern region
SRFMTTISouthern Region Farm Machinery Training & Testing InstituteGarladinne, Anantapur district, Andhra Pradesh1983Southern region
NERFMTTINorth Eastern Region Farm Machinery Training & Testing InstituteBiswanath Chariali, Assam1990North-Eastern region

42 approved testing bodies in total — the 4 FMTTIs above, plus 38 identified institutions (State Agricultural Universities, ICAR institutes and state departments) spanning nearly every Indian state, from Bihar and Gujarat to Tamil Nadu and West Bengal. Several are additionally authorised for Plant Protection Equipment or Post-Harvest Technology machinery specifically. We confirm the right one for your machine and location — not every category needs an FMTTI specifically.

Section 03

Why FMTTI testing matters

Agricultural implements and machinery costing more than ₹35,000 generally require testing and approval from an FMTTI or a designated testing centre before they can be supplied under government-assisted programmes. An FMTTI test report is what makes a machine eligible for:

SMAM (Sub-Mission on Agricultural Mechanization)RKVYPKVYCustom Hiring Centre (CHC) subsidy
Section 04

What gets tested

FMTTI institutes evaluate tractors, power tillers, combine harvesters and other self-propelled machinery, trailers, and engines (including mass-emission testing). Tractor type-approval specifically runs under Rule 126 of the Central Motor Vehicles Rules, 1989, against the AIS standards series — AIS-017 (Part 2) for the type-approval procedure, AIS-007 for tractor specifications, AIS-137 for emission test cycles, and AIS-037 for Conformity of Production.

Booked-out test slots

Institute capacity is limited; slots are often committed months ahead.

Documentation complexity

Detailed engineering drawings and specifications are required before a test can even be scheduled.

Fee & timeline pressure

Costs and lead times can be hard to plan around without prior experience.

Section 05

FMTTI vs ARAI vs ICAT vs BIS

All three of ARAI, ICAT and FMTTI are notified CMVR Rule-126 testing bodies for Indian tractors, running type-approval against the same published AIS standards regardless of which one does the work. FMTTI Budni holds a unique national mandate specifically for tractors and power tillers — its Director is recognised as the Testing Authority for the whole country under this rule.

BodyRole
FMTTI (CFMTTI Budni)National testing authority for tractor/power-tiller type-approval; also runs performance & endurance tests for the wider machine categories.
ARAI / ICATAlternate notified CMVR bodies, often used for emission-cycle testing (AIS-137) or when FMTTI's slots are constrained.
BISNational product/safety standards body — works alongside FMTTI's test procedure, not a substitute for it.
Section 06

The application-to-report process

Run on the Centralized Farm Machinery Performance Testing Portal across four roles — Manufacturer, Admin, Sub-Admin and Test Engineer. Every stage below is a real, tracked step.

StepActorAction
01ManufacturerRegisters on the Centralized Farm Machinery Performance Testing Portal and submits the duly filled application form online, with all supporting documents.
02AdminForwards the application to the Sub-Admin for scrutiny.
03Sub-AdminExamines the application and (after Admin approval) communicates any discrepancies to the manufacturer.
04ManufacturerSubmits a corrected application addressing the discrepancies.
05Sub-AdminExamines the corrected application.
06AdminApproves the application and intimates the manufacturer.
07ManufacturerUploads the fee receipt.
08AdminVerifies the fee paid.
09Sub-AdminAllocates a test officer and period via random sampling.
10ManufacturerSends the selected equipment for testing.
11AdminReceives the equipment and assigns a Test Engineer.
12Test EngineerTests the equipment, uploads intermediate results, and prepares the Draft Test Report (DTR).
13AdminApproves the DTR.
14ManufacturerSubmits comments on the DTR.
15AdminForwards the comments to the Test Engineer for examination.
16Test EngineerExamines the comments and prepares the Final Test Report (FTR).
17AdminExamines the FTR, then approves and releases it.
18ManufacturerReceives the Final Test Report (FTR).

SMS alert and email notifications are sent to the applicant by the system at every stage.

Section 07

Fees, validity & documents

Real, sourced answers to the questions manufacturers ask before they even contact an institute — starting with the official testing-charge schedule itself.

Machinery categoryTesting charge, FY 2025-26
Components / Hand tools₹30,514
Power-operated thresher, decorticator, sheller, winnower, brush cutter, chain saw, chaff cutter etc.₹1,21,961
Animal-drawn equipment₹65,059
Tractor drawn/operated implements: rotavator, cultivator, harrow, plough etc.₹2,07,357
Manually operated equipment₹45,922
Power tiller-drawn/self-propelled reaper, power weeder etc.₹1,21,961
Tractor drawn/operated seed-cum-fertilizer drill, straw reaper, mini rice mill, seed cleaner/grader, baler, laser land leveller, potato digger etc.₹2,17,502
Animal-drawn multi tool bar (min. 4 attachments)₹1,72,771
Self-propelled paddy/vegetable transplanter₹2,96,783
Ride-on self-propelled tool bar (up to 2 attachments)₹2,96,783
Power-operated multi-crop thresher (2+ crops)₹2,23,616
Pump set (engine + pump), kerosene/LPG₹1,06,930
Pump set without engine₹50,783
Plant protection equipment — manual/battery operated₹69,732
Plant protection equipment — power operated₹1,83,102

Rates exclusive of GST (18%, per SRFMTTI's published schedule); effective 01.04.2025 for FY 2025-26. Revised roughly once every two years (this was an 8% revision; next expected ~01.04.2027, subject to review). Issued to FMTTIs and FMTCs (Farm Machinery Training Centres) alike.

A real discrepancy, stated honestly

Three different official figures are in circulation for power-tiller testing, and they are not interchangeable. (1) The Ministry's general per-category schedule above (F.No. 13-14/2020-M&T) lists ₹1,21,961 for “power tiller drawn / self-propelled reaper, power weeder etc.” (2) SRFMTTI's own published FY 2025-26 charges carry a separate power-tiller table at ₹5,61,320, for both Initial Commercial Test and Batch Test. (3) Under the dedicated new-regime circular (Office Order No. 13-17/2021-M&T(I&P)(FTS-98794)), SRFMTTI's signed schedule effective 01.04.2026 totals ₹4,07,478 with running-in, or ₹3,30,590 without. Each covers a different scope under a different circular — they are not versions of one number. Confirm which figure and circular apply to your machine with your target institute before budgeting.

Commercial vs Confidential test

Commercial Test

Establishes the performance characteristics of machines that are in, or ready for, commercial production. This is the standard test most manufacturers need.

Confidential Test

Provides confidential performance information ahead of commercial launch — typically used for a prototype not yet ready for public disclosure. Priced 10% higher than the equivalent Commercial Test.

Report validity, by category

Validity varies by machinery category — and ICT (Initial Commercial Test) validity isn’t always longer than the subsequent Batch Test validity.

CategoryICT validityBatch test validity
Tractor3 yrs5 yrs
Power tiller3 yrs5 yrs
Combine harvester / crop, sugarcane, cotton picker7 yrs5 yrs
Self-propelled machinery5 yrs5 yrs
Tractor/power-tiller operated implements (tillage, sowing/planting, inter-culture, harvesting, thresher, baler/rake/reaper, post-hole digger)7 yrs5 yrs
Plant protection equipment — manual/battery operated5 yrs5 yrs
Plant protection equipment — tractor/engine operated7 yrs5 yrs
Post-harvest technology machinery (cleaner/grinder/washer/grader/polisher/separator)7 yrs5 yrs
Bullock-drawn/manual driven (incl. horticulture tools)7 yrs5 yrs

Batch quality-check sample size

For machines already approved and being supplied under a government scheme — not the count for your first test submission (see Documents needed).

  • Machinery costing up to ₹35,00020 units
  • Machinery costing ₹35,000 – ₹1,00,00010 units
  • Machinery costing ₹1,00,000 and above5 units
  • Combined harvesters3 units
  • Tractors and power tillers5 units
  • Any imported machinery5 units

What else to budget for

Fee rules that sit around the headline schedule — a partial test isn’t priced pro-rata, and a withdrawal isn’t refundable.

  • Confidential test premiumA confidential test costs 10% more than the fee applicable to the Initial Commercial Test for the same machine.
  • Confidential → Commercial conversionAn additional 50% of the Initial Commercial Test fee, deposited with the Director of the institute at the time of application — refunded if the conversion is not approved.
  • Withdrawal after submissionOnce a machine is submitted for full test and the fee is deposited, withdrawing it earns no refund of the test fee.
  • How to payOnline only, through the Government of India NTRP portal (bharatkosh.gov.in); the e-receipt is attached to the application.
  • GST18% on top of the test fee — FMTTI testing is classified as “Technical Testing and Analysis Service”, Chapter No. 998346.

Testing only part of the machine

If you need only some parameters tested rather than the full schedule, the fee is set by slab, not pro-rata — testing a single parameter still costs 40% of the full fee.

Scope of testFee charged
One test parameter only40% of the full test fee
More than one parameter, up to 50% of the total test parameters75% of the full test fee
Full laboratory test only, where both laboratory and field tests are prescribed90% of the full test fee
Full field test only, where both laboratory and field tests are prescribed90% of the full test fee

SRFMTTI published testing-charge notes and test regulations (srfmtti.dacnet.nic.in/Testing.html), issued under Ministry OM F.No. 13-14/2020-M&T(I&P)(C-82979), 31 January 2025. GST classification per letter C.No. V/19/14/2017/Stats-GST Queries, dated 11 August 2017, Office of the Assistant Commissioner of Central Tax, GST Division, Anantapur (A.P.).

Documents needed, with copy counts

That Order is explicit: an application that does not fulfil this requirement will be summarily rejected. The specification format is category-specific — confirm which one applies to your machine with your target institute before submitting.

#DocumentCopies
01Application form, duly filled up3 sets
02Detailed technical specification in the institute's published format for your machine category, where one exists3 sets
03Declaration of selected performance characteristics, duly filled (per IS 13539:2008)3 sets
04Operator's manual3 sets
05Service manual3 sets
06Parts catalogue3 sets
07Fast-moving parts — tynes, shares, bolts, bearings, seals etc.1 set
08Other literature, if any1 set
09Photographs of the machine/implement/equipment2 sets
10Drawing / isometric view of the machine/implement/equipment2 sets
11Copy of the CMVR certificate, valid on the date of application (power tillers only)1 set
12Copy of the engine emission certificate, complete in all respects and valid on the date of application (power tillers only)1 set
13Test-fee payment receipt for the applicable machine category1 set

Ministry of Agriculture & Farmers Welfare Order No. 13-37/2000-M&T(I&P), dated 8 March 2013, as published in SRFMTTI's testing document checklist (srfmtti.dacnet.nic.in/Testing.html).

Worked example: Power Tiller Initial Commercial Test

A real, itemised breakdown — SRFMTTI’s own signed schedule, effective 01.04.2026.

Specification / Initial Inspection₹22,693
Running-in (20 hours)₹76,888
Rotary Performance Test₹23,562
Brake Performance Test₹5,339
Drawbar Performance Test₹25,579
Noise Level Test₹9,066
Turning Ability Test₹3,442
Nominal Speed Test₹3,661
Haulage Test₹17,517
Field Test₹1,09,235
Torture Test₹7,229
Material Test & Chemical Composition₹9,735
Miscellaneous charges₹93,531
Total (with running-in)₹4,07,478
Total (without running-in)₹3,30,590
How AgPro helps — and what we don’t do

AgPro Consulting guides manufacturers and buyers through the entire FMTTI process: preparing test documentation, and providing guidance, consultation and information on institute liaison, scheduling, and interpreting results and compliance requirements against the scheme you’re targeting. The physical testing itself is always performed by FMTTI’s own engineers at their institute— AgPro’s role is guidance, not running the test rig ourselves.

Section 08

FMTTI — frequently asked questions

FMTTI stands for Farm Machinery Training and Testing Institute — a network of 4 institutes under India's Ministry of Agriculture & Farmers Welfare that trains operators and tests agricultural machinery for performance, safety and compliance.
Talk to a consultant

Ready to start your FMTTI testing journey?

Tell us about your machine and your goal — we'll confirm the right institute and guide you from documentation to your Final Test Report.

Offices
Pune · New Delhi
Response time
One business day

Tell us about your machine.

We reply within one business day.

Free & no-obligation. One business day.